EPC For Tie In Works at South East - Package A

Group Octa successfully executed the EPC for Tie-In Works at South East – Package A in the United Arab Emirates, delivering installation, testing, and commissioning of electrical works for gas lift wells and the Multi Selector Manifold. Completed for ADNOC Onshore, this onshore project was realized between April 2015 and April 2018 with a strong focus on quality, safety, and technical precision.

EPC For Tie In Works at South East - Package C

Group Octa executed the EPC for Tie-In Works at South East – Package C in the UAE, covering installation, testing, and commissioning of electrical works for gas lift wells and the Multi Selector Manifold. Completed for ADNOC Onshore, this onshore project was delivered between July 2018 and July 2023 with precision and high safety standards.

Interconnection of ADWEC CRS to DEL at Taweelah

Executed the Interconnection of ADWEC CRS to DEL at Taweelah in the UAE, involving the installation, testing, and commissioning of the Gas Metering Skid along with associated instrumentation and electrical systems. Delivered for ADNOC Gas Processing, this onshore project was carried out from March 2015 to September 2016 with a focus on quality, safety, and reliability.

RENOVATION OF DAS ISLAND MULTIPURPOSE SPORTS HALL

Executed the renovation of the Das Island Multipurpose Sports Hall in the UAE, covering EPC services for electromechanical, instrumentation, telecommunication, and HVAC works. Completed for GCC/ADNOC LNG, this offshore project was carried out from September 2013 to June 2014 with a focus on quality, safety, and seamless execution.

CALL OFF CONTRACT

Executed a long-term call-off contract at Umm Shaif, UAE, delivering electrical and instrumentation works across UZ and LZ facilities. Completed for ADNOC Offshore, this offshore project was carried out from 2016 to 2022 with consistent focus on safety, quality, and timely delivery.

HV / LV ELECTRICAL SYSTEMS UPGRADE

Completed the upgrade of HV/LV electrical systems at the Umm Shaif Super Complex, covering detailed engineering, design, procurement, and construction of HV switchgears, LV switchgears, and transformers. Delivered for ADNOC Offshore, this offshore project was realized between 2017 and 2013 as per the provided schedule, ensuring enhanced reliability and system performance.

ELV back bone network system for ADNOC Ruwais Housing

The ELV backbone network system for the ADNOC Ruwais Housing Complex – Phase IV was delivered through EPC of a fiber optic cabling system. This onshore project in Ruwais was completed for ADNOC between 2016 and 2017 with a strong focus on quality, reliability, and seamless connectivity.

AMC for Transformers, Fire & Gas System and CCTV system

Provided an annual maintenance contract for electrical and instrumentation works on the DNO Platform in RAK, UAE. This onshore project was completed in 2016, ensuring reliable operation and consistent technical support for the client.

Upgradation of SCADA system in dolphin plant

Upgraded the SCADA system at the Dolphin Plant through the design, engineering, supply, and installation of a 3.3/11 kV transformer. This offshore project was completed in 2017 for Bunduq, ensuring improved efficiency and operational reliability.

AMC for E&I works in DNO Platform

An annual maintenance contract was carried out for electrical and instrumentation works on the DNO Platform in RAK, UAE. Completed in 2016, this onshore project ensured reliable operations and consistent technical support for the client.

Upgradation of SCADA system in dolphin plant.

Upgraded the SCADA system at the Dolphin Plant through the Taweelah–Fujairah Pipeline (TFP) Cables Replacement Project at the Taweelah Receiving Facilities. This onshore project in Taweelah was completed in 2017 for Dolphin Energy, ensuring enhanced system reliability and operational efficiency.

UPGRADATION OF EXISTING URACA PUMPS

Upgraded the existing URACA pumps in Ruwais through the supply, installation, testing, and commissioning of cable ladder racks and power cables for URACA pump motors. This onshore project for ADNOC Fertilizers was completed between August 2013 and February 2014, ensuring improved reliability and operational performance.

Upgrade of 3.3KV & 11KV Switchboards at Substations

Upgraded 3.3 kV and 11 kV switchboards at multiple substations in Habshan, covering EPC works for 3.3 kV switchboards at Substations 2, 3, and 6, and 11 kV switchboards at Substation 5. Completed for ADNOC Gas Processing, this onshore project was carried out from 2016 to 2018 with a strong focus on safety, reliability, and system performance.

EPC FOR PROVISION OF SOLAR STREET LIGHTING SYSTEM FROM HABSHAN- 5 JUNCTION TO HABSHAN PLANT JUNCTION ON TARIF- HABSHAN ROAD

Provided a complete solar street lighting system from Habshan-5 Junction to Habshan Plant Junction on the Tarif–Habshan Road, including design, detailed engineering, manufacturing, integration, testing, transportation, supply, installation, and commissioning. This onshore project for ADNOC Gas Processing was carried out between January 2014 and January 2015/2017 as per the provided timeline, ensuring enhanced energy efficiency and reliable illumination.

ASAB 3 (A3)/ LSP & Lightning Protection System

Upgraded the ASAB 3 (A3) LSP & Lightning Protection System through basic engineering, supply, installation, pre-commissioning, commissioning assistance, and start-up support of armored cables, switches, sockets, cable trays, and GI conduits with accessories. This onshore project in ASAB was completed for ADNOC Gas Processing between May 2011 and September 2012, ensuring enhanced safety and system reliability.

Upgradation of Plant Control System at DR-1

Upgraded the Plant Control System at DR-1 in Qatar, including the supply, installation, splicing, and testing of fiber optic cables; dismantling of existing panels; installation of new panels; re-routing and replacing checker plates with frames; and commissioning of field instruments and systems. This onshore project for Honeywell/Qatar Steel was completed between August and September 2013, ensuring improved control and operational efficiency.

Replacement and Upgrading of Control System panels

Replaced and upgraded control system panels in Saudi Arabia, covering the procurement and construction of network cabinets, RTU panels, DCS cabinets, F&G cabinets, and PDB cabinets. This onshore project for Honeywell/Aramco was completed between August and September 2013, enhancing system reliability and operational performance.

Midfield Terminal, Abu Dhabi Airports- Etihad Premium Lounge

Delivered BMS system installation and commissioning support for the Etihad Premium Lounge at the Midfield Terminal, including the supply of DDC panels, cabling, and complete BMS installation. This onshore project in Abu Dhabi was executed for Depa/ADAC from May 2017 to May 2021, ensuring seamless integration and efficient system performance.

Dubai Expo 2020

Provided BMS system installation and commissioning support for Dubai Expo 2020, including the supply of DDC panels and cables. This onshore project in Dubai was executed for Siemens/Dubai Expo from January 2020 to April 2021, ensuring smooth system integration and reliable performance.

Etisalat

Delivered BMS system installation and commissioning support for Etisalat, including the supply of DDC panels and cables. This project for Siemens/Etisalat was carried out from July 2020 to July 2023, ensuring reliable system integration and efficient performance.

Etihad Rail- Al Falah Depot

Provided BMS system installation and commissioning support for the Etihad Rail – Al Falah Depot, including the supply of DDC panels and cables. This project for Siemens/Etihad Rail was executed from February 2022 to May 2023, ensuring smooth integration and reliable system performance.

Trojan, Staff Facility – Al Falah, Abu Dhabi

Supplied and installed Energy Monitoring System panels, DDC panels, CTs, cabling, and terminations, along with commissioning support for the Trojan Staff Facility in Al Falah, Abu Dhabi. This onshore project for Siemens/Trojan was carried out from September 2022 to November 2023, ensuring efficient system integration and reliable performance.

Midfield Terminal, Abu Dhabi Airports

Delivered BMS system installation and commissioning support for the Midfield Terminal at Abu Dhabi Airports, including the supply of DDC panels, cabling, and complete BMS installation. This onshore project for Siemens/ADAC was carried out between March 2018 and February 2020, ensuring seamless integration and reliable system performance.